This is an old revision of the document!
==== Meeting Minutes - January 13, 2009 ==== Meeting – January 13, 2009 Report Meeting • Add section about what the project is supposed to do and the components • Make Work Breakdown Structure more horizon o Add caption about what numbers represent o Can use abbreviations of Names • On sensors section put headings • Parallax PING Sensor (say where acquired) • Sensors figure: Large and Small, explain saturation o Add section about extra waveforms o Leave out section about oscillations • Arduino o Show the specs and shrink the rest o Put full specs in the appendix • Motor Controller o Justify purchase o More specifications o Required specs of the H-Bridge IC o Need more specifications in general • In Scheduling o Refer to first figure o Refer to Gantt Chart • Division of labour o Investigate new motor and design new motor drive, speced the motor • Potentiometer o Add to budget • Move section on specs for microcontroller • Intelligence Algorithm o Issues with PIR sensors o Different scenarios o Filters o Take information from proposal • In Gantt Chart o What is meant by construction? o Software integration? Intelligence algorithm? o Put software integration right after component integration o Add caption about completion o Show a second Gantt Chart in Meeting with up-to-date • Problem and risk management o Risk level -> low, medium , high Aside • Look into getting a piece of plexiglass that lets infrared ==== Meeting Minutes - January 7, 2009 ==== **Present:** * Jonathan Mash * Mike Studli * Liliane Barbour **Agenda** * Blueprint paper - task assignment **Discussion:** * Liliane is in charge of contacting Dr. Hashtrudi-Zaad to set-up a meeting time * All team members are to finalize their course schedule in order to plan arranged meeting times * Task assignments were arranged to optimize the blueprint writting procedure * Control board and motor control board interfacing standard was discussed and agreed upon --------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------- ==== Meeting Minutes - Nov 20, 2008 ==== --------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------- ==== Meeting Minutes - Nov 14, 2008 ==== Sensors * Putting blinders on sensors * Problem that it might not detect close objects. * Need more cure for sensors to each have their own area. * Need to test thermal sensor -> see if can be used to differentiate between objects * Will order more PIRs later in case some get damaged Motor * How much force on gears? Don’t want to break * If use gears can use a smaller stepper motor * Algorithm: ramp start and stop * Spline curve -> so can start acceleration with zero slope at beginning and zero slope at end * Spline toolbox in MATLAB Electrical * Heat sinks * Do we need an enclosure? * Test on bigger TVs Microcontroller * Need a lot of analog ports -> 8? * Serial output Ordering plan * Buy pre-fab controller, and purchase PING, etc. * When see how much money left, then buy parts for custom controller and PIR sensors * PERF board * Need to put PCB boards in the budget What we need now * Excel table with minimum costs in a budget * Possible other budget with custom controller, etc. For next week * Budget * Test thermal sensors *Test volume * Look for evaluation board for controller * Ease of programming * Power supply * memory --------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------- ==== Meeting Minutes - October 30th, 2008 ==== **Present:** * Dr. Hastrudi-Zaad * Jonathan Mash * Mike Studli * Liliane Barbour **Agenda** * Proposal paper **Discussion:** * Reviewed proposal report * Looked at web-site * Clean front end of web-site * Have some password protection option **Project:** * Check devices but we may need budget approval first * Contact: Steve Humphrey * Items and testing devices * Use volt meter and oscilloscope to test * Particular bench set-up if we need special equipment * Research proximity sensors * Discussed next meeting date * * field trip next Thursday so the following Thursday November 13th **Deliverables for the next meeting** * Deliverables for November 13th Meeting: * Look at sensors * Crude plan of what we want to do * Present all options (uC, fpga, etc) * Up-dated budget * Be ready to start ordering
Back to top