- | ==== Meeting Minutes - January 13, 2009 ==== | ||
- | Meeting – January 13, 2009 | ||
- | Report Meeting | ||
- | * Add section about what the project is supposed to do and the components | ||
- | * Make Work Breakdown Structure more horizon | ||
- | ** Add caption about what numbers represent | ||
- | ** Can use abbreviations of Names | ||
- | * On sensors section put headings | ||
- | * Parallax PING Sensor (say where acquired) | ||
- | * Sensors figure: Large and Small, explain saturation | ||
- | ** Add section about extra waveforms | ||
- | ** Leave out section about oscillations | ||
- | * Arduino | ||
- | ** Show the specs and shrink the rest | ||
- | ** Put full specs in the appendix | ||
- | * Motor Controller | ||
- | ** Justify purchase | ||
- | ** More specifications | ||
- | ** Required specs of the H-Bridge IC | ||
- | ** Need more specifications in general | ||
- | * In Scheduling | ||
- | ** Refer to first figure | ||
- | ** Refer to Gantt Chart | ||
- | * Division of labour | ||
- | ** Investigate new motor and design new motor drive, speced the motor | ||
- | * Potentiometer | ||
- | ** Add to budget | ||
- | * Move section on specs for microcontroller | ||
- | * Intelligence Algorithm | ||
- | ** Issues with PIR sensors | ||
- | ** Different scenarios | ||
- | ** Filters | ||
- | ** Take information from proposal | ||
- | * In Gantt Chart | ||
- | ** What is meant by construction? | ||
- | ** Software integration? Intelligence algorithm? | ||
- | ** Put software integration right after component integration | ||
- | ** Add caption about completion | ||
- | ** Show a second Gantt Chart in Meeting with up-to-date | ||
- | * Problem and risk management | ||
- | ** Risk level -> low, medium , high | ||
- | Aside | ||
- | * Look into getting a piece of plexiglass that lets infrared | ||
- | |||
- | |||
- | |||
- | ==== Meeting Minutes - January 7, 2009 ==== | ||
- | |||
- | |||
- | **Present:** | ||
- | * Jonathan Mash | ||
- | * Mike Studli | ||
- | * Liliane Barbour | ||
- | |||
- | **Agenda** | ||
- | * Blueprint paper - task assignment | ||
- | |||
- | |||
- | **Discussion:** | ||
- | * Liliane is in charge of contacting Dr. Hashtrudi-Zaad to set-up a meeting time | ||
- | * All team members are to finalize their course schedule in order to plan arranged meeting times | ||
- | * Task assignments were arranged to optimize the blueprint writting procedure | ||
- | * Control board and motor control board interfacing standard was discussed and agreed upon | ||
- | |||
- | |||
- | --------------------------------------------------------------------------------------------------- | ||
- | --------------------------------------------------------------------------------------------------- | ||
- | |||
- | |||
- | ==== Meeting Minutes - Nov 20, 2008 ==== | ||
- | |||
- | |||
- | |||
- | --------------------------------------------------------------------------------------------------- | ||
- | --------------------------------------------------------------------------------------------------- | ||
- | |||
- | |||
- | ==== Meeting Minutes - Nov 14, 2008 ==== | ||
- | |||
- | Sensors | ||
- | * Putting blinders on sensors | ||
- | * Problem that it might not detect close objects. | ||
- | * Need more cure for sensors to each have their own area. | ||
- | * Need to test thermal sensor -> see if can be used to differentiate between objects | ||
- | * Will order more PIRs later in case some get damaged | ||
- | |||
- | Motor | ||
- | * How much force on gears? Don’t want to break | ||
- | * If use gears can use a smaller stepper motor | ||
- | * Algorithm: ramp start and stop | ||
- | * Spline curve -> so can start acceleration with zero slope at beginning and zero slope at end | ||
- | * Spline toolbox in MATLAB | ||
- | |||
- | Electrical | ||
- | * Heat sinks | ||
- | * Do we need an enclosure? | ||
- | * Test on bigger TVs | ||
- | |||
- | Microcontroller | ||
- | * Need a lot of analog ports -> 8? | ||
- | * Serial output | ||
- | |||
- | Ordering plan | ||
- | * Buy pre-fab controller, and purchase PING, etc. | ||
- | * When see how much money left, then buy parts for custom controller and PIR sensors | ||
- | * PERF board | ||
- | * Need to put PCB boards in the budget | ||
- | |||
- | What we need now | ||
- | * Excel table with minimum costs in a budget | ||
- | * Possible other budget with custom controller, etc. | ||
- | |||
- | For next week | ||
- | * Budget | ||
- | * Test thermal sensors | ||
- | *Test volume | ||
- | * Look for evaluation board for controller | ||
- | * Ease of programming | ||
- | * Power supply | ||
- | * memory | ||
- | |||
- | --------------------------------------------------------------------------------------------------- | ||
- | --------------------------------------------------------------------------------------------------- | ||
- | |||
- | |||
- | |||
- | |||
- | ==== Meeting Minutes - October 30th, 2008 ==== | ||
- | |||
- | **Present:** | ||
- | * Dr. Hastrudi-Zaad | ||
- | * Jonathan Mash | ||
- | * Mike Studli | ||
- | * Liliane Barbour | ||
- | |||
- | **Agenda** | ||
- | * Proposal paper | ||
- | |||
- | |||
- | **Discussion:** | ||
- | |||
- | * Reviewed proposal report | ||
- | |||
- | * Looked at web-site | ||
- | |||
- | * Clean front end of web-site | ||
- | |||
- | * Have some password protection option | ||
- | |||
- | **Project:** | ||
- | |||
- | * Check devices but we may need budget approval first | ||
- | * Contact: Steve Humphrey | ||
- | * Items and testing devices | ||
- | * Use volt meter and oscilloscope to test | ||
- | * Particular bench set-up if we need special equipment | ||
- | * Research proximity sensors | ||
- | * Discussed next meeting date | ||
- | * * field trip next Thursday so the following Thursday November 13th | ||
- | |||
- | |||
- | **Deliverables for the next meeting** | ||
- | |||
- | * Deliverables for November 13th Meeting: | ||
- | * Look at sensors | ||
- | * Crude plan of what we want to do | ||
- | * Present all options (uC, fpga, etc) | ||
- | * Up-dated budget | ||
- | * Be ready to start ordering | ||