Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
minutes [2009/01/08 17:51]
mstudli
— (current)
Line 1: Line 1:
-==== Meeting Minutes - January 7th, 2009 ==== 
- 
- 
-**Present:​** 
-  * Jonathan Mash 
-  * Mike Studli 
-  * Liliane Barbour 
- 
-**Agenda** 
-  * Blueprint paper - task assignment 
- 
- 
-**Discussion:​** 
-  * Liliane is in charge of contacting Dr. Hashtrudi-Zaad to set-up a meeting time 
-  * All team members are to finalize their course schedule in order to plan arranged meeting times 
-  * Task assignments were arranged to optimize the blueprint writting procedure 
-  * Control board and motor control board interfacing standard was discussed and agreed upon 
- 
- 
---------------------------------------------------------------------------------------------------- 
---------------------------------------------------------------------------------------------------- 
- 
- 
-==== Meeting Minutes - Nov 20, 2008 ==== 
- 
- 
- 
---------------------------------------------------------------------------------------------------- 
---------------------------------------------------------------------------------------------------- 
- 
- 
-==== Meeting Minutes - Nov 14, 2008 ==== 
- 
-Sensors 
-  * Putting blinders on sensors 
-    * Problem that it might not detect close objects. 
-  * Need more cure for sensors to each have their own area. 
-  * Need to test thermal sensor -> see if can be used to differentiate between objects 
-  * Will order more PIRs later in case some get damaged 
- 
-Motor 
-  * How much force on gears? Don’t want to break 
-  * If use gears can use a smaller stepper motor 
-  * Algorithm:​ ramp start and stop 
-  * Spline curve -> so can start acceleration with zero slope at beginning and zero slope at end 
-    * Spline toolbox in MATLAB 
- 
-Electrical 
-  * Heat sinks 
-  * Do we need an enclosure? 
-  * Test on bigger TVs 
- 
-Microcontroller 
-  * Need a lot of analog ports -> 8? 
-  * Serial output 
- 
-Ordering plan 
-  * Buy pre-fab controller, and purchase PING, etc. 
-  * When see how much money left, then buy parts for custom controller and PIR sensors 
-  * PERF board 
-  * Need to put PCB boards in the budget 
- 
-What we need now 
-  * Excel table with minimum costs in a budget 
-  * Possible other budget with custom controller, etc. 
- 
-For next week 
-  * Budget 
-  * Test thermal sensors 
-  *Test volume 
-    * Look for evaluation board for controller 
-    * Ease of programming 
-    * Power supply 
-    * memory 
- 
---------------------------------------------------------------------------------------------------- 
---------------------------------------------------------------------------------------------------- 
- 
- 
- 
- 
-==== Meeting Minutes - October 30th, 2008 ==== 
- 
-**Present:​** 
-  * Dr. Hastrudi-Zaad 
-  * Jonathan Mash 
-  * Mike Studli 
-  * Liliane Barbour 
- 
-**Agenda** 
-  * Proposal paper 
- 
- 
-**Discussion:​** 
- 
-  * Reviewed proposal report 
- 
-  * Looked at web-site 
- 
-  * Clean front end of web-site 
- 
-  * Have some password protection option 
- 
-**Project:​** 
- 
-  * Check devices but we may need budget approval first  
-  * Contact: Steve Humphrey 
-  * Items and testing devices 
-  * Use volt meter and oscilloscope to test 
-  * Particular bench set-up if we need special equipment 
-  * Research proximity sensors 
-  * Discussed next meeting date 
-  *   * field trip next Thursday so the following Thursday November 13th 
- 
- 
-**Deliverables for the next meeting** 
- 
-  * Deliverables for November 13th Meeting: 
-  * Look at sensors 
-  * Crude plan of what we want to do 
-  * Present all options (uC, fpga, etc) 
-  * Up-dated budget 
-  * Be ready to start ordering 
  
minutes.1231437080.txt.gz · Last modified: 2009/01/08 17:51 by mstudli
Back to top
chimeric.de = chi`s home Creative Commons License Valid CSS Driven by DokuWiki do yourself a favour and use a real browser - get firefox!! Recent changes RSS feed Valid XHTML 1.0